Vellko Penalized Wall Systems

CONSTRUCTIONS The production of individual components are made for installation at home. Elements manufactured in such a way that are used for houses have the best technical, static, diffusion and acoustic properties that are currently required from buildings. At the construction site, according to the classical technology, only the foundation plate is prepared with the corresponding conclusions of individual engineering networks (sewage, water, electricity, gas). The overfond part of the building is assembled on a construction site from elements manufactured at the factory and mounted with a crane. This process lasts for several days, followed by the installation of the roof and interior decoration.

Price Start From  

$11.50

Factory Direct
Price Start From  

$5.01

Factory Direct
Price Start From  

$9.72

Factory Direct
Shop BY

Price:

Materials:

Special Offers: